<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Metropolitan Water Reclamation District of Greater Chicago - File #: 18-0878</title><link>https://mwrd.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=3644551&amp;GUID=6C8C07DD-0B60-4577-9115-A97715A9DBE7</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://mwrd.legistar.com/Feed.ashx?GUID=6C8C07DD-0B60-4577-9115-A97715A9DBE7&amp;ID=3644551&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>Metropolitan Water Reclamation District of Greater Chicago - File #: 18-0878</title><link>https://mwrd.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=3644551&amp;GUID=6C8C07DD-0B60-4577-9115-A97715A9DBE7</link><guid isPermaLink="false">6C8C07DD-0B60-4577-9115-A97715A9DBE7-2023-03-21-16-16-04</guid><description>Title: Authority to grant to MCImetro Access Transmission Services Corp., d/b/a Verizon Access Transmission Services: (1) a 25-year, 3,441+ sq. ft. non-exclusive easement to construct, install, operate, maintain, repair and remove a fiber optic transmission cable and appurtenances on and beneath North Shore Channel Parcels 9.11 and 9.15 in Chicago, Illinois and (2) a 90-day, 9,627+ sq. ft. temporary construction easement on North Shore Channel Parcel 9.11.  Consideration shall be an initial annual fee of $5,000.00 for the 25-year easement and a fee of $5,000.00 for the temporary construction easement</description><pubDate>Tue, 21 Mar 2023 16:16:04 GMT</pubDate></item></channel></rss>