<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Metropolitan Water Reclamation District of Greater Chicago - File #: 18-0052</title><link>https://mwrd.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=3309322&amp;GUID=F72D43B1-D232-4056-8DB4-574712990603</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://mwrd.legistar.com/Feed.ashx?GUID=F72D43B1-D232-4056-8DB4-574712990603&amp;ID=3309322&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>Metropolitan Water Reclamation District of Greater Chicago - File #: 18-0052</title><link>https://mwrd.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=3309322&amp;GUID=F72D43B1-D232-4056-8DB4-574712990603</link><guid isPermaLink="false">F72D43B1-D232-4056-8DB4-574712990603-2023-03-21-16-15-27</guid><description>Title: Authority to grant to the Morton Grove Niles Water Commission: (1) an 18-month, 17,843 sq. ft. temporary construction easement and (2) a 70-year, 38,517 sq. ft. non-exclusive easement to construct, install, operate, maintain, repair and remove three (3) subterranean 30-inch water mains on part of North Shore Channel Parcels 3.02, 3.03 and 3.05 and beneath the North Shore Channel in Evanston and Skokie, Illinois.  Consideration shall be a fee of $45,500.00 for the temporary construction easement and an initial annual fee of $65,479.00 for the 70-year easement</description><pubDate>Tue, 21 Mar 2023 16:15:27 GMT</pubDate></item></channel></rss>