To watch the live meeting proceedings, please refresh this page at the scheduled meeting time, a link labeled "In Progress" will appear under the Video column
File #: 14-0915    Version: 1
Type: Agenda Item Status: Adopted
File created: 8/18/2014 In control: Engineering Committee
On agenda: 9/4/2014 Final action: 9/4/2014
Title: Authority to execute a Structure Assignment Agreement between Metropolitan Water Reclamation District of Greater Chicago and City of Chicago for transfer of the sewer system located at South Loomis Street: Eleanor Street to Archer Avenue in Chicago, Illinois, pursuant to Sewer Connection Authorization No. 03-CH-11
TRANSMITTAL LETTER FOR BOARD MEETING OF SEPTEMBER 4, 2014
 
COMMITTEE ON ENGINEERING
 
Mr. David St. Pierre, Executive Director
 
Title
Authority to execute a Structure Assignment Agreement between Metropolitan Water Reclamation District of Greater Chicago and City of Chicago for transfer of the sewer system located at South Loomis Street: Eleanor Street to Archer Avenue in Chicago, Illinois, pursuant to Sewer Connection Authorization No. 03-CH-11
Body
 
Dear Sir:
 
 
In April 2004, MWRD approved the issuance of a sewer connection authorization to the City of Chicago as part of the Viaduct Clearance Improvement - South Loomis Street: Eleanor Street to Archer Avenue Project, including improvements that would require modification of an existing city sewer. Special Condition No. 12 for MWRD Sewer Construction Authorization No. 03 CH 11 requires the transfer of ownership of all sewer structures, including the connection chamber, to MWRD.  The City of Chicago and MWRD have reached an agreement transferring ownership of the connection chamber. Consideration is a nominal fee of $10.00.
 
Accordingly, it is respectfully requested that the Executive Director recommend to the Board of Commissioners that it authorize and approve the execution of the Sewer System Assignment Agreement for Sewer Construction Authorization No. 03-CH-11, upon the terms and conditions referenced above.
 
It is further respectfully requested that the Executive Director recommend to the Board of Commissioners that the Chairman of the Committee on Finance and the Clerk be authorized and directed to execute the Structure Assignment Agreement on behalf of MWRD after same is approved by the General Counsel as to form and legality.
 
Requested, Ronald M. Hill, General Counsel, RMH:HSW:MTC:kk
Recommended, David St. Pierre, Executive Director
Respectfully Submitted, Frank Avila, Chairman Committee on Engineering
Disposition of this agenda item will be documented in the official Regular Board Meeting Minutes of the Board of Commissioners for September 4, 2014