File #: 14-0952    Version: 1
Type: Agenda Item Status: Adopted
File created: 8/22/2014 In control: Finance Committee
On agenda: 9/4/2014 Final action: 9/4/2014
Title: Authority to add Project 14-606-21, Replacement of Drain Tiles at the Calumet Union Drainage Ditch Reservoir, to the Construction Fund, estimated cost of the project is $550,000.00.
TRANSMITTAL LETTER FOR THE BOARD MEETING OF SEPTEMBER 4, 2014
 
COMMITTEE ON FINANCE
 
Mr. David St. Pierre, Executive Director
 
Title
Authority to add Project 14-606-21, Replacement of Drain Tiles at the Calumet Union Drainage Ditch Reservoir, to the Construction Fund, estimated cost of the project is $550,000.00.
Body
 
Dear Sir:
 
Authority is requested to add Project 14-606-21, Replacement of Drain Tiles at the Calumet Union Drainage Ditch Reservoir, to the Construction Fund at the request of the Maintenance and Operations Department.
 
The purpose of the project is to remediate sink holes, eliminate ponding and restore the proper drainage of Pond No. 4, as well as reduce sedimentation of the wet well at the Calumet Union Drainage Ditch Reservoir. An inspection indicates that the sink holes, ponding conditions and sedimentation are due to multiple collapsed segments of the perimeter drain tiles in Pond No. 4.
The project consists of complete replacement of the perimeter drain tiles in Pond No. 4 at the Calumet Union Drainage Ditch Reservoir. The estimated cost of the project is $550,000.00.
 
Requested, Manju Prakash Sharma, Director of Maintenance and Operations, SES:SO'C:MAG:CM:JK
Respectfully Submitted, Cynthia Santos, Chairman Committee on Finance