File #: 16-0567    Version: 1
Type: Agenda Item Status: Adopted
File created: 5/20/2016 In control: Procurement Committee
On agenda: 6/2/2016 Final action: 6/2/2016
Title: Authority to advertise Contract 15-122-3P Aeration Tanks Air Valves Automation in Batteries A, B, C and D, Stickney Water Reclamation Plant, estimated cost $8,000,000.00, Account 401-50000-645650, Requisition 1427329
Attachments: 1. 15-122-3P Project Fact Sheet.pdf

TRANSMITTAL LETTER FOR BOARD MEETING OF JUNE 2, 2016

 

COMMITTEE ON PROCUREMENT

 

Mr. David St. Pierre, Executive Director

 

Title

Authority to advertise Contract 15-122-3P Aeration Tanks Air Valves Automation in Batteries A, B, C and D, Stickney Water Reclamation Plant, estimated cost $8,000,000.00, Account 401-50000-645650, Requisition 1427329

Body

 

Dear Sir:

 

Contract documents and specifications have been prepared for Contract 15-122-3P Aeration Tanks Air Valves Automation in Batteries A, B, C and D, Stickney Water Reclamation Plant (WRP).

 

The purpose of this project is to replace existing manually operated angle globe valves with new automated valves.  The first half of Pass 1 of each aeration tank in Batteries A, B, C and D has been converted to an anaerobic zone, as part of the process modification for enhanced biological phosphorus removal that is being implemented at Stickney WRP.  This valve replacement work will facilitate an easier and safer means of operating these valves.  The associated process air piping will also be modified.

 

The project consists of the following:

 

1.                     Remove and dispose of one hundred and twelve (112) existing 4” angle globe valves and drop air pipes in Aeration Battery A and Battery B each.

 

2.                     Install fifty-six (56) new 4” butterfly valves and new electrical actuators in Aeration Battery A and B each.

 

3.                     Remove and dispose of fifty-six (56) existing 6” angle globe valves and drop air pipes in Aeration Battery C and Battery D each.

 

4.                     Install forty (40) new 6” butterfly valves and new electrical actuators in Aeration Battery C and Battery D each.

 

5.                     Install new air piping, fittings and pipe supports to accommodate new installations as necessary.

 

6.                     Add additional Ovation’s Distributed Control System (DCS) panels and hardware to the existing Ovation panels.

 

7.                     Incorporate graphics and programming for new actuated valves into the Ovation system.

 

8.                     Provide conduit and wire to power new electrical actuators, DCS control and status of actuators.

 

9.                     Provide structural supports for electrical conduits.

 

It is estimated that 80 jobs will be created or saved as a result of award of this contract with an estimated 29,874 man-hours of skilled trades utilized.

 

The estimated cost for this contract is $8,000,000.00.

 

The bid deposit for this contract is $320,000.00.

 

The contract specifications require that all work shall be completed within 620 calendar days after approval of the contractor’s bond.  Liquidated damages are $1,000.00 for each calendar day that the contractor is in default of the time specified for failing to achieve substantial work completion and $200.00 for each calendar day that the contractor is in default of the time specified for completion of the entire work.

 

The Multi-Project Labor Agreement will be included in this contract.

 

The Affirmative Action Ordinance, Revised Appendix D will be included in this contract.  The type of work to be performed under the contract is within the “Mechanical” category for establishing Minority-owned Business Enterprises (MBE), Women-owned Business Enterprises (WBE) and/or Small Business Enterprises (SBE) utilization goals.  The MBE, WBE and/or SBE utilization goals for this contract are: 20 percent MBE, 9 percent WBE, and 10 percent SBE.

 

The tentative schedule for this contract is as follows:

Advertise                     July 13, 2016

Bid Opening                     August 16, 2016

Award                     November 17, 2016

Completion                     August 13, 2018

 

Funds are available in Account 401-50000-645650.

 

In view of the foregoing, it is recommended that the Director of Procurement and Materials Management be authorized to advertise Contract 15-122-3P.

 

Requested, Catherine A. O’Connor, Director of Engineering, MVL:GR

Recommended, Darlene A. LoCascio, Director of Procurement and Materials Management

Respectfully Submitted, Barbara J. McGowan, Chairman Committee on Procurement

Disposition of this agenda item will be documented in the official Regular Board Meeting Minutes of the Board of Commissioners for June 2, 2016

 