File #: 17-0215    Version: 1
Type: Agenda Item Status: Adopted
File created: 2/15/2017 In control: Finance Committee
On agenda: 3/2/2017 Final action: 3/2/2017
Title: Authority to add Project 17-803-21, Furnish and Deliver a Replacement Variable Frequency Drive for Low Level Pump No. 5 at the Calumet Water Reclamation Plant, to the Construction Fund, estimated cost of the project is $65,000.00.

TRANSMITTAL LETTER FOR BOARD MEETING OF MARCH 2, 2017

 

COMMITTEE ON FINANCE

 

Mr. David St. Pierre, Executive Director

 

Title

Authority to add Project 17-803-21, Furnish and Deliver a Replacement Variable Frequency Drive for Low Level Pump No. 5 at the Calumet Water Reclamation Plant, to the Construction Fund, estimated cost of the project is $65,000.00.

Body

 

Dear Sir:

 

Authority is requested to add Project 17-803-21, Furnish and Deliver a Replacement Variable Frequency Drive for Low Level Pump No. 5 at the Calumet Water Reclamation Plant, to the Construction Fund at the request of the Maintenance and Operations Department.

 

The purpose of this project is to procure a variable frequency drive to replace the existing faulted unit on low level pump No. 5 at the Calumet Water Reclamation Plant.

 

The project consists of furnishing and delivering the specified equipment in order to restore full service of low level pump No. 5 at the Calumet Water Reclamation Plant. The estimated cost of this project is $65,000.00.

 

Requested, John P. Murray, Director of Maintenance and Operations, BAP:SO’C:MAG:JR:JMC

Respectfully Submitted, Frank Avila, Chairman Committee on Finance

Disposition of this agenda item will be documented in the official Regular Board Meeting Minutes of the Board of Commissioners for March 2, 2017