Title: Authority is requested to add project Furnish and Deliver a Stake Body Truck to the Calumet Water Reclamation Plant, to the Construction Fund, estimated cost of the project is $70,000.00

TRANSMITTAL LETTER FOR BOARD MEETING OF JUNE 7, 2018

 

COMMITTEE ON FINANCE

 

Mr. John P. Murray, Acting Executive Director

 

Title

Authority is requested to add project Furnish and Deliver a Stake Body Truck to the Calumet Water Reclamation Plant, to the Construction Fund, estimated cost of the project is $70,000.00

Body

 

Dear Sir:

 

Authority is requested to add project Furnish and Deliver a Stake Body Truck to the Calumet Water Reclamation Plant, to the Construction Fund, at the request of the Maintenance and Operations Department under the NJPA Purchasing Contract No. 120716-NAF.

 

This project consists of the procurement of a stake body truck to replace an existing vehicle with excessive corrosion that has resulted in the detachment of the body from the frame. The vehicle needing replacement is a 2006 Ford F550 4x4 crew cab, stake body truck, with lift gate, with accumulated mileage of 96,431. The cost of repairing the truck to date has reached $56,000.00. This vehicle is essential for movement of necessary equipment used in the treatment processes at the Calumet Water Reclamation Plant.

 

The estimated cost of the project is $70,000.00.

 

Requested, Brett Garelli, Acting Director of Maintenance and Operations, BAP:SO’C:MAG:TC:ND:JR:SM