Title: Authority to increase Contract 21-262-3S Calumet 18E Relief Connecting Structure and Sewer Work, CSA,  to Rausch Infrastructure, LLC, in an amount of $9,192.69, from an amount of $3,108,314.10, to an amount not to exceed $3,117,506.79, Account 401-50000-645600, Purchase Order No. 4000095
Attachments: 1. Change Order Log - Purchase Order 4000095

TRANSMITTAL LETTER FOR BOARD MEETING OF JANUARY 9, 2025

 

COMMITTEE ON PROCUREMENT

 

Mr. Brian A. Perkovich, Executive Director

 

Title

Authority to increase Contract 21-262-3S Calumet 18E Relief Connecting Structure and Sewer Work, CSA,  to Rausch Infrastructure, LLC, in an amount of $9,192.69, from an amount of $3,108,314.10, to an amount not to exceed $3,117,506.79, Account 401-50000-645600, Purchase Order No. 4000095

Body

 

Dear Sir:

 

On December 1, 2022, the Board of Commissioners authorized the Director of Procurement and Materials Management to award Contract 21-262-3S Calumet 18E Relief Connecting Structure and Sewer Work, CSA to Rausch Infrastructure, LLC in an amount not to exceed $2,817,700.00, plus a five (5) percent allowance for change orders in an amount of $140,885.00, for a total amount not to exceed $2,958,585.00. The scheduled contract completion date is June 16, 2025.

 

As of December 20, 2024, the attached list of change orders has been approved.

 

Original Contract Amount                     $2,817,700.00

Date of Board Approval                                                               12/01/2022

Cumulative Change Orders (12/20/2024)                     $290,614.10

% Change of Original Contract Value                                          10.31%

Current Contract Value                                                               $3,108,314.10

Requested Increase                                                                                     $9,192.69

New Contract Value                                                                                    $3,117,506.79

% Change of Current Contract Value                                          0.30%

Total % Change of Original Contract Value                     10.64%

 

The purpose of this contract is to construct a 48-inch diameter sewer and connection structure to provide relief to the Calumet Intercepting Sewer 18F, Calumet Intercepting Sewer 18F ext. A, Calumet Intercepting Sewer 18E, and the Palos Hills Pumping Station during wet weather by diverting flow to the 78-inch Calumet Intercepting Sewer 20R-2.

 

The contract documents included work to connect the proposed 48-inch diameter sewer to an existing access manhole. However, upon field investigation it was discovered that an existing concrete platform inside the access manhole was in direct conflict with the sewer connection. Change order COR-02, approved on October 27, 2023, included work for demolition of the concrete platform and sewer connection. However, reinforcement material and labor associated with the restoration work was omitted from the scope as the condition of the manhole wall was not ascertainable at the time. Change order COR-08 includes the installation of reinforcement and associated labor to restore the access manhole wall affected by the removal of the concrete platform as submitted in the approved shop drawings. The contractor submitted a cost proposal (CO-08) for an extra in the amount of $9,192.69 and a credit in the amount of $0.00, for a net extra in the amount of $9,192.69. The Engineer reviewed the proposal, found it to be reasonable, and stated via correspondence CO08, that the Engineering Department will recommend its approval to the Board of Commissioners.

 

This change order is in compliance with the Illinois Criminal Code since the change is due to circumstances not reasonably foreseeable at the time the contract was signed and is in the best interest of the District.

 

It is hereby recommended that the Board of Commissioners authorize the Director of Procurement and Materials Management to execute a change order to increase Contract 21-262-3S in an amount of $9,192.69 (0.30% of the current contract value), from an amount of $3,108,314.10, to an amount not to exceed $3,117,506.79.

 

Funds are available in Account 401-50000-645600.

 

Requested, Catherine A. O’Connor, Director of Engineering, KMF:LS

Recommended, Darlene A. LoCascio, Director of Procurement and Materials Management

Respectfully Submitted, Marcelino Garcia, Chairman Committee on Procurement