File #: 08-1091    Version: 1
Type: Agenda Item Status: Adopted
File created: 3/6/2008 In control: Procurement Committee
On agenda: 3/6/2008 Final action: 3/6/2008
Title: Authority to advertise Contract 08-617-11, Maintenance and Repair Services for Switchgear, Transformers and Motors at Various Locations, estimated cost is $141,000.00, Accounts 101-69000, 68000-612650 and 101-66000-612620 (Req. 1233543, 1231320 and 1235344)

TRANSMITTAL LETTER FOR BOARD MEETING OF MARCH 6, 2008

 

COMMITTEE ON PURCHASING

 

Mr. Richard Lanyon, General Superintendent

 

Title

Authority to advertise Contract 08-617-11, Maintenance and Repair Services for Switchgear, Transformers and Motors at Various Locations, estimated cost is $141,000.00, Accounts 101-69000, 68000-612650 and 101-66000-612620 (Req. 1233543, 1231320 and 1235344)

Body

 

Dear Sir:

 

Contract documents have been prepared for the procurement of services to perform preventive maintenance and repairs on switchgear, transformers, motors and other electrical equipment in the Stickney and Calumet service areas, and at the Lockport Powerhouse. The services will ensure the safe, efficient and reliable operation of the equipment at these locations.

 

The contract specifications require all work to begin in June 2008, and terminate by December 31, 2010. Liquidated damages are fifty dollars ($50.00) for every hour after seventy-two (72) hours that the Contractor is late in responding to a request from the Engineer for scheduled service, or fifty Dollars ($50.00) for every hour after six (6) hours that the Contractor is late in responding to a call for emergency service.

 

The total estimated cost of the services is $141,000.00 for a three-year period. The estimated 2008 expenditure is $32,300.00. The estimated 2009 expenditure is $59,700.00. The estimated 2010 expenditure is $49,000.00. Funds for the 2008 expenditure are available in Accounts 101-69000, 68000-612650 and 101-66000-612620.

 

The Contractor’s bid deposit is $7,100.00.

 

The Multi-Project Labor Agreement and Appendix D are not included in this Contract because the work involves the servicing, testing and calibration of switchgear and protective relaying, as well as transformers, motors and other electrical equipment. This work can only be performed by the equipment manufacturer’s engineers, or by other highly skilled technicians trained in the servicing of similar equipment and certified by a national accrediting body. If any trade work is required, it will be performed by in-house labor forces.

 

Advertisement                     .3/19/08

Bid Opening                     4/8/08

Contract Award                     5/15/08

Completion                     12/31/10

 

Therefore, it is recommended that the Contract Documents be approved by the Board of Commissioners and that the Purchasing Agent advertise for bids.

 

If further clarification is required, please advise the undersigned.

 

Requested, Osoth Jamjun, Chief of Maintenance & Operations, MPS:SO’C:MAG:IJA

Recommended, Darlene A. LoCascio, Purchasing Agent

Respectfully Submitted, Barbara J. McGowan, Chairman Committee on Purchasing

ORDERED passed by affirmative roll call vote of a majority of the Commissioners present this March 6, 2008.  Approved, President Terrence J. O’Brien