To watch the live meeting proceedings, please refresh this page at the scheduled meeting time, a link labeled "In Progress" will appear under the Video column
File #: 19-0434    Version: 1
Type: Agenda Item Status: Adopted
File created: 4/23/2019 In control: Real Estate Development Committee
On agenda: 5/2/2019 Final action: 5/2/2019
Title: Authority to issue a five (5) day permit to Rubino Engineering, Inc. to perform geotechnical and environmental soil borings on a portion of Main Channel Parcel 37.02 in Forest View, Illinois along the proposed construction route of a sewer line.  Consideration shall be $5,000.00
Attachments: 1. Authority to issue a 5-day Soil Boring Permit to Rubino Engineering - Aerial.pdf

TRANSMITTAL LETTER FOR BOARD MEETING OF MAY 2, 2019

 

COMMITTEE ON REAL ESTATE

 

Mr. Brian A. Perkovich, Executive Director

 

Title

Authority to issue a five (5) day permit to Rubino Engineering, Inc. to perform geotechnical and environmental soil borings on a portion of Main Channel Parcel 37.02 in Forest View, Illinois along the proposed construction route of a sewer line.  Consideration shall be $5,000.00

Body

 

Dear Sir:

 

The Village of Forest View (“Village”) is planning to construct a storm sewer that will connect to an Illinois Department of Transportation outfall located east of Harlem Avenue and north of Main Channel Parcel 37.02 to reduce flooding in the area.  The proposed route of the Village’s sewer line will be beneath a District roadway located at the northern edge of Parcel 37.02.

 

Rubino Engineering, Inc., a Village contractor, has requested a 5-day permit to perform approximately four (4) geotechnical and environmental soil borings along the proposed sewer line route across Parcel 37.02.  The soil borings will be backfilled with approved materials and the roadway will be re-paved with matching pavement.

 

Parcel 37.02 is leased by KM Phoenix Holdings, LLC ("KM") until February 28, 2039.  The permit is therefore subject to the written consent of KM. 

 

The District’s technical departments have reviewed Rubino’s request and have no objections thereto.  A permit fee in the amount of $5,000.00 is recommended, as the pro-rata share of 10% of the fair market value of the land would yield a fee less than the District's minimum permit fee of $5,000.00.

 

It is requested that the Executive Director recommend to the Board of Commissioners that it authorize and approve the issuance of a five (5) day permit to Rubino Engineering, Inc. to perform geotechnical and environmental soil borings on a portion of Main Channel Parcel 37.02 in Forest View, Illinois along the proposed construction route of a sewer line.  Consideration shall be $5,000.00.

 

It is also requested that the Executive Director recommend to the Board of Commissioners that the Chairman of the Committee on Finance and the Clerk be authorized and directed to execute said permit agreement after it is approved by the General Counsel as to form and legality.

 

Requested, Susan T. Morakalis, General Counsel, STM:CMM:nhb

Recommended, Brian A. Perkovich, Executive Director

Disposition of this agenda item will be documented in the official Regular Board Meeting Minutes of the Board of Commissioners for May 2, 2019

 

Attachment