File #: 25-0273    Version: 1
Type: Agenda Item Status: Deleted
File created: 3/27/2025 In control: Real Estate Development Committee
On agenda: 4/3/2025 Final action: 4/3/2025
Title: Authority to negotiate an Intergovernmental Agreement with the Chicago Transit Authority for the Red Line Extension Project
Attachments: 1. RE - Authority to Negotiate CTA IGA Aerial.pdf

TRANSMITTAL LETTER FOR BOARD MEETING OF APRIL 3, 2025

 

COMMITTEE ON REAL ESTATE

 

Mr. John P. Murray, Acting Executive Director

 

Title

Authority to negotiate an Intergovernmental Agreement with the Chicago Transit Authority for the Red Line Extension Project

Body

 

Dear Sir:

 

Authorization is requested to negotiate an Intergovernmental Agreement (IGA) with the Chicago Transit Authority (CTA) for the Red Line Extension Project (Project). CTA’s overall Project includes extending the CTA’s Red Line from 95th Street to 130th Street, construction of a new Red Line station south of 130th Street, and a rail yard near the District’s Calumet Water Reclamation Plant (Calumet WRP).

 

Because a portion of the new Red Line extension will cross the Calumet WRP, CTA will need to coordinate construction activities with the District and obtain certain real estate interests. In particular, CTA must purchase three parcels of the Calumet WRP west of Cottage Grove Avenue, obtain a permanent easement near the Kensington Marsh, and obtain a temporary construction easement within the Calumet WRP. Although the real estate interests will be negotiated as part of the IGA, the required real estate interests will be brought to the Board separately for its consideration and approval.

 

The IGA is also needed to ensure the continuity of District operations. The Red Line extension will disrupt the Calumet WRP’s east and west connectivity and operations over Cottage Grove Avenue. The District’s trucks will no longer be able to move low density solids from the Calumet WRP to its drying beds east of existing railroad tracks. Due to this disruption, CTA has agreed to fund a portion of a District construction project to rehabilitate an MWRD pipeline under the railroad tracks and add centrifuges on the east side of the railroad tracks. The centrifuges will accept and process the low density solids currently moved by truck. The CTA’s funding and the District’s construction project will be memorialized in the IGA; however, as with the required real estate interests, the District’s construction project will be brought to the Board separately for its consideration and approval.

 

In addition, the IGA will require CTA to construct a private roadway to replace the current Cottage Grove Avenue and allow the District a permanent easement to use the roadway to access its west drying beds at the Calumet WRP. CTA and MWRD will also be required to coordinate their respective construction activities in furtherance of the Project. 

 

Staff from multiple departments including Maintenance and Operations, Engineering and Law continue to review the Project and its impact on District operations.

 

Based on the foregoing, it is requested that the Board of Commissioners grant authority for the District to negotiate an IGA with the Chicago Transit Authority for the Red Line Extension Project. 

 

Requested, Susan T. Morakalis, General Counsel, STM:EMA

Recommended, John P. Murray, Acting Executive Director

Disposition of this agenda item will be documented in the official Regular Board Meeting Minutes of the Board of Commissioners for April 3, 2025

 