Legislation Details

File #: 26-0485    Version: 1
Type: Report Status: Filed
File created: 7/7/2026 In control: Finance Committee
On agenda: 7/16/2026 Final action: 7/16/2026
Title: Report to the Board of Commissioners on the District’s intention to issue General Obligation Capital Improvement Bonds in an amount not to exceed $550,000,000

TRANSMITTAL LETTER FOR BOARD MEETING OF JULY 16, 2026

 

COMMITTEE ON FINANCE

 

Mr. John P. Murray, Executive Director

 

Title

Report to the Board of Commissioners on the District’s intention to issue General Obligation Capital Improvement Bonds in an amount not to exceed $550,000,000

Body

 

Dear Sir:

 

The Engineering Department and the Treasurer have examined capital fund balances in relation to District projects currently identified under the Capital Improvement Program and determined that a bond sale is required to maintain balances to fund ongoing and expected capital projects.

 

The District is holding this public hearing to receive comments on the intention of the Board of Commissioners to sell general obligation capital improvement bonds in an amount not to exceed $550,000,000. The bonds will be issued as State Revolving Fund loan obligations and as part of a bond sale in the capital markets.

 

The general obligation capital improvement bonds will fund the following current and future projects:

 

Project Number                                          Project Name

 

73-161-EH                     McCook Reservoir Vulcan Agreement Hard Costs

07-027-3SR                 North Side Sludge Pipeline Replacement - Section 1, NSA, Rebid

08-174-3D                     Battery A Improvements and Battery B Installation of Mechanical Mixers,

                                                                                           SWRP

10-047-3S                     North Shore 1 Rehabilitation, NSA

12-369-3S                     Upper Des Plaines Intercepting Sewer 11D Rehabilitation, NSA

15-069-3D                     Rehabilitation of Steel Spandrel Beams of Pump and Blower House,

                                                                                          O’Brien Water Reclamation Plant

16-129-3D                     Battery C Final Settling Tanks, Rehabilitation of Concrete, SWRP

17-132-4F                     McCook Reservoir Stage 2 Final Reservoir Preparation, SSA

17-273-4P                     Furnish and Install Odor Control System at Thornton Reservoir

18-144-3M                    Mainstream TARP Pumps Rehabilitation, SWRP

18-148-3P                     Digester Rehabilitation and Gas Piping Replacement - Phase II, Stickney

                                                                                         Water Reclamation Plant

18-540-3P                     Plant Improvements, HPWRP

19-154-3E                     Low Voltage Switchgear Replacement, MSPS

19-155-3MR               Boilers 3, 4, 5, and MCC Replacement, Stickney Water Reclamation Plant,

                                                                                          Rebid

19-156-3E                     Electrical Improvements at Aerated Grit, Central Heat, Pump and Blower,

                             and Southwest Coarse Screens, SWRP

19-255-3D                     Rehabilitation of Pump and Blower House, CWRP

19-257-3D                     6th Street Tunnel Rehabilitation, CWRP

19-258-3E                     Switchgear and Motor Control Center Replacement, CWRP

19-375-3P                     Phosphorous Removal and Odor Control Facilities, KWRP

19-415-3P                     Phosphorous Removal, EWRP

19-543-3E                     Switchgear Replacement at HPWRP and Motor Control Center

                             Replacement at Upper DuPage Reservoir, NSA

19-717-3P                     Additional Grit Removal Tank and Construction of New Plant Entrance, LWRP

19-856-3E                     TARP Control System Replacement, CSA, NSA, SSA

20-087-3P                     Chemical Phosphorous Removal, OWRP

20-160-4H                     TARP Mainstream Dropshaft DS-M73E at Armitage Avenue, SSA

20-161-3S                     Salt Creek Intercepting Sewer No. 3 Rehabilitation, SSA

21-092-3P                     Battery E Activated Sludge Facility, OWRP

22-094-3D                     Rehabilitation of Elevated Deck and Boat Dock at North Branch

                                                          Pumping Station, NSA

22-263-3P                     Gravity Belt Thickener Installation and Building Rehabilitation, CWRP

22-376-3P                     Gloria Alitto Majewski Reservoir Rehabilitation, NSA

22-879-3S                     Civil Consulting Support Services (2027-2029)

23-173-3S                     Southwest Side Intercepting Sewer No. 15, 16, and 17B Rehabilitation, SSA

23-264-3S                     Calumet Intercepting Sewer No. 13 Rehabilitation, CSA

23-378-3SR                Upper Des Plaines Dropshaft 1/1A and 5 Rehabilitation and Calumet

                                                          Dropshaft 34 Modification, NSA and CSA

23-379-3E                     Electrical Power Distribution and Phosphorus Removal Improvements,

                                                          KWRP

23-416-2S                     Kirie-Egan Solids Pipeline Rehabilitation Section No. 1, NSA

23-417-3S                     Kirie-Egan Solids Pipeline Rehabilitation Section No. 2, NSA

23-418-3S                     Kirie-Egan Solids Pipeline Rehabilitation Section No. 3, NSA

24-001-3P                     Full-Floor Aeration Installation in Battery D, OWRP

24-002-3P                     Upgrade Grit Dewatering and Install Sludge Screen, OWRP

24-006-3D                     Rehabilitation of Service Tunnel Expansion Joints, OWRP

24-099-3P                     Replacement of Devon Avenue Instream Aeration Station, NSA

24-176-3H                     North and South Guard Valve Chambers Shotcrete Lining Rehabilitation,

                                                                                       MSPS

24-177-3P                     Scum System Improvements, SWRP

24-178-3P                     Convert WASSTRIP Tanks to Waste Activated Sludge Thickening Tanks and

                                                                                        Install Sludge Screen, SWRP

24-179-3P                     Replacement of Grit Pumps and Piping at Southwest Aerated Grit Facility,

                                                                                      SWRP

24-185-3D                     Replacement of Scale House, Scale, Shop and Storage Buildings, and City

                                                          Water with Canal Water Service, LASMA

24-267-3S                     Calumet Intercepting Sewer Nos. 2, 3, 4, and 10 Rehabilitation, CSA

24-268-3P                     Replacement of Dewatering Facility, CWRP

24-269-3P                     Install Pipe Casing and Utilities Under Railroad Tracks to Dewatering

                                                         Facility, CWRP

24-278-3M                     Replacement of TARP Coarse Screen Hoist and Installation of Low-Level

                                                                                      Interceptor Screen, CWRP

24-270-3P                     Install Drain Tile at Blower Building and Porous Pavement Parking Lot, CWRP

24-271-3P                     Reline Lagoon 6, CWRP

24-274-3D                     Battery A Aeration Tank Rehabilitation, CWRP

24-384-3D                     Rehabilitation of Service Tunnel Expansion Joints and Replacement of

                                                                                       Road E, KWRP

24-420-3P                     Replacement of Gravity Belt Thickeners, EWRP

24-422-3M                     Replacement of Stop Logs and Guide, EWRP

24-546-3D                     Rehabilitation of Service Tunnel Expansion Joints, HPWRP

24-545-3P                     Install Lagoon and Upgrade Drainage and Riser System at Fisher Farm,

                                                                                       HPWRP

24-638-22A                   HVAC Improvements at Various Locations Group A

24-638-22B                  HVAC Improvements at Various Locations Group B

24-892-3P                     M-E-P Consulting Services Task Order Contract

24-901-31                      Aeration Blower Improvements, SWRP

25-007-3M                     Coarse Screen System Replacement, NBPS and OWRP

25-191-4F                     McCook Reservoir Stage 1 Highwall STA 1113+10 to 1115+30 Stabilization, SSA

25-192-3P                     West Side Aerated Grit Tanks 1 and 8 Installation and Blower Modifications, SWRP

25-282-3P                     Furnish and Deliver Mechanical Dewatering Centrifuges, CWRP

25-730-21                     HVAC Improvements at the Egan and Kirie Water Reclamation Plants

26-822-31                     TARP Mechanical Equipment Improvements, CWRP

                                                              

                                                               General Expenditure*

 

*Other appropriate cost items of the District’s ongoing Capital Improvement Program, as permitted by the District’s statutory authority to issue bonds, and as approved by the Board of Commissioners from time to time.

 

Requested, Catherine A. O’Connor, Director of Engineering, KMF:LS